| |
 |
Scientific meeting |
 |
|
| | Post date: 2023/12/6 | |
|
Scientific meeting:
School of Geology of the University of Tehran and the Iranian Tunneling Association (IRTA) with the cooperation of Tehran Urban Planning and Research Center (TUPRC) organize:
"Scientific meeting: the role of urban underground spaces in sustainable development (Geological and Environmental issues)"
In this meeting, which has been endorsed by the International Tunnelling And Underground Space Association (ITA), international experts will speak on the topic of the meeting, emphasizing geological and environmental issues, and will answer the questions of the participants. All interested persons are proudly invited to participate in this meeting.
(https://about.ita-aites.org/future-events)
|
|
|
| View: 725 Time(s) | Print: 318 Time(s) | Email: 0 Time(s) | 0 Comment(s) |
|
|
| |
|
|
 |
WTC2024: |
 |
|
| | Post date: 2023/11/18 | |
|
WTC2024:
FULL PAPER SUBMISSION EXTENDED 03 November 2023 Due to many requests from authors, the WTC 2024 Organizing Committee is pleased to announce that the WTC2024 full paper submission deadline has been extended to Nov.15, 2023. Authors of accepted abstracts are kindly requested to upload the full paper via
https://conference-service.com/wtc2024/access.html
before this final deadline. No further extensions will be granted. The full Paper acceptance notification will be sent to authors before December 15th, 2023.
صفحه زیلینک انجمن تونل:
|
|
|
| View: 616 Time(s) | Print: 302 Time(s) | Email: 0 Time(s) | 0 Comment(s) |
|
|
| |
|
|
 |
The ITA TUNELLNG AWARDS 2023 FINALISTS |
 |
|
| | Post date: 2023/11/18 | |
|
The ITA TUNELLNG AWARDS 2023 FINALISTS:
Dear Digital Participants The digital awards event has just opened. All the finalists' presentations are already already online allowing each delegate to view all presentations at its own pace and to be able to participate fully in the conference. The round tables and awards ceremony will be held online on 24 November, the scheduled date of the event. On the virtual platform, open until end of December 2023, you will have access to all finalists presentations, round tables, digital exhibition and awards ceremony. Link to the Virtual Experience:
ttps://ita-aites.6connex.eu/event/ITAVirtualEvents/login?lang=en-us&mcc=ITAAwards2023DigitalPlatform
Then, go to the frame « Already Registered ? » and log in with your email address.Please use the same adress as in this e-mail. Hope you will enjoy! ITA Awards Organizing Team
----------
:صفحه زیلینک انجمن تونل
|
|
|
| View: 708 Time(s) | Print: 326 Time(s) | Email: 0 Time(s) | 0 Comment(s) |
|
|
| |
|
|
 |
Tunnelling work for planned Bristol underground would be ‘relatively easy’ | UK |
 |
|
| | Post date: 2023/04/3 | |
|
|
|
|
| View: 543 Time(s) | Print: 242 Time(s) | Email: 0 Time(s) | 0 Comment(s) |
|
|
| |
|
|
 |
First TBM launched for construction of Patna Metro underground section | India |
 |
|
| | Post date: 2023/04/3 | |
|
|
|
|
|
| View: 553 Time(s) | Print: 229 Time(s) | Email: 0 Time(s) | 0 Comment(s) |
|
|
| |
|
|
 |
Car-free future: Europe’s longest cycle tunnel aims to cut traffic in this Norwegian city |
 |
|
| | Post date: 2023/04/3 | |
|
|
|
|
|
| View: 714 Time(s) | Print: 322 Time(s) | Email: 0 Time(s) | 0 Comment(s) |
|
|
| |
|
|
 |
Right-line tunnel of Xiangya Road river-crossing passway drilled through in central China |
 |
|
| | Post date: 2023/04/3 | |
|
|
|
|
|
| View: 783 Time(s) | Print: 355 Time(s) | Email: 0 Time(s) | 0 Comment(s) |
|
|
| |
|
|
 |
HAB wins Oslo E18 tunnel work | Norway |
 |
|
| | Post date: 2023/04/3 | |
|
|
|
|
|
| View: 485 Time(s) | Print: 204 Time(s) | Email: 0 Time(s) | 0 Comment(s) |
|
|
| |
|
|
 |
RFI kicks off tunnel excavation for Naples-Bari high-speed line in Italy |
 |
|
| | Post date: 2023/04/3 | |
|
|
|
|
|
| View: 718 Time(s) | Print: 331 Time(s) | Email: 0 Time(s) | 0 Comment(s) |
|
|
| |
|
|
 |
Vancouver’s Broadway Subway project celebrates second tunnel breakthrough | Canada |
 |
|
| | Post date: 2023/04/3 | |
|
|
|
|
|
| View: 471 Time(s) | Print: 223 Time(s) | Email: 0 Time(s) | 0 Comment(s) |
|
|
| |
|
|
 |
Double 15.01m Slurry TBMs victories in China |
 |
|
| | Post date: 2023/04/3 | |
|
|
|
|
|
| View: 599 Time(s) | Print: 320 Time(s) | Email: 0 Time(s) | 0 Comment(s) |
|
|
| |
|
|
 |
Subterranean Japanese Libraries : underground library |
 |
|
| | Post date: 2023/04/3 | |
|
|
|
|
|
| View: 750 Time(s) | Print: 344 Time(s) | Email: 0 Time(s) | 0 Comment(s) |
|
|
| |
|
|
 |
HS2 reveals design for last key structure for Chiltern Tunnel | UK |
 |
|
| | Post date: 2023/04/3 | |
|
Enter your news text here
|
|
|
| View: 351 Time(s) | Print: 149 Time(s) | Email: 0 Time(s) | 0 Comment(s) |
|
|
| |
|
|
 |
خبر |
 |
|
| | Post date: 2017/08/20 | |
|
| End of the excavation of line 2 of Tabriz’s urban train
After a year of continuous effort, Tabriz’s urban train line 2 came to the end and all TBM excavation equipment were taken out from its underground track successfully.
|
|
|
| View: 3223 Time(s) | Print: 1043 Time(s) | Email: 0 Time(s) | 0 Comment(s) |
|
|
| |
|
|
 |
خبر |
 |
|
| | Post date: 2017/08/19 | |
|
Beginning of the explosion operation in order to speed up Vahdat tunnel excavation in Larestan
Senior manager of road and urbanity of Larestan notifies of the explosion operation in Vahdat tunnel in Lar-Jahrom path in order to speed up the tunnel excavation |
|
|
| View: 2897 Time(s) | Print: 865 Time(s) | Email: 0 Time(s) | 0 Comment(s) |
|
|
| |
|
|
 |
خبر |
 |
|
| | Post date: 2017/08/18 | |
|
Authorities attention to the phase one of Qom subway utilization by the end of the year 97
The governor of Qom recommended the officials to finish the phase one of Qom subway utilization until the end of the year 97 while he was pointing to the progress of Qom subway project. |
|
|
| View: 2961 Time(s) | Print: 921 Time(s) | Email: 0 Time(s) | 0 Comment(s) |
|
|
| |
|
|
 |
خبر |
 |
|
| | Post date: 2017/08/9 | |
|
Ghalibaf:the construction of the subway ended in Tehran.
Tehran_Irna_Tehran’s mayor said:”By opening of the line 8 of Tehran subway and the final completion and testing of line 6,construction of the subway in Tehran has ended. |
|
|
| View: 2690 Time(s) | Print: 920 Time(s) | Email: 0 Time(s) | 0 Comment(s) |
|
|
| |
|
|
 |
Entry of Tehran’s subway line 6 project to the world cup final |
 |
|
| | Post date: 2017/08/7 | |
|
Entry of Tehran’s subway line 6 project to the world cup final
Tehran’s subway line 6 project ,which was approved by Iran Tunnel Association,were introduced as the representative of our country to ITA Award201 championship in 2017.
|
|
|
| View: 2921 Time(s) | Print: 978 Time(s) | Email: 0 Time(s) | 0 Comment(s) |
|
|
| |
|
|
 |
Mexico’s longest tunnel project being excavated |
 |
|
| | Post date: 2017/07/25 | |
|
Mexico’s longest tunnel project being excavated
Two specially configured hydraulic breakers from Indeco are being used in the project to construct Mexico’s longest tunnel. The HP 3000 ABF units are being used at the Aca-Túnel jobsite in Acapulco to help build the new tunnel, which is intended to reduce congestion in one of Mexico’s most popular tourist destinations...
|
|
|
| View: 2721 Time(s) | Print: 882 Time(s) | Email: 0 Time(s) | 0 Comment(s) |
|
|
| |
|
|
 |
Mexico’s longest tunnel project being excavated |
 |
|
| | Post date: 2017/07/25 | |
|
Mexico’s longest tunnel project being excavated
Two specially configured hydraulic breakers from Indeco are being used in the project to construct Mexico’s longest tunnel. The HP 3000 ABF units are being used at the Aca-Túnel jobsite in Acapulco to help build the new tunnel, which is intended to reduce congestion in one of Mexico’s most popular tourist destinations...
|
|
|
| View: 2805 Time(s) | Print: 969 Time(s) | Email: 0 Time(s) | 0 Comment(s) |
|
|
| |
|
|
| |