[Home ]   [ فارسی ]  
:: Home About Association News & Events Search Contact ::
Main Menu
Home::
About Us::
Tunnelling in Iran::
Working Groups::
News & Events::
Publications::
Library::
Useful Linkes::
Tunnel Database::
Photo Gallery::
Contact us::
Site Facilities::
webmail::
::
Receive site information
Enter your Email in the following box to receive the site news and information.
..
:: News ::
 | Post date: 2015/10/28 | 

Riyadh Metro Line 2 East Tunnel Breakthrough

AWT IMAGE
Breakthrough has been achieved in the East Tunnel of Line 2 of the Riyadh Metro Project, according to the Gall Zeidler website (
www.gzconsultants.com). The Riyadh Metro Project is currently one of the largest and most complex infrastructure projects in the world. The project consists of 6 metro lines connecting various parts of the city. The planned rail network is comprised of a system of elevated rail, rail at grade and two underground running tunnels. Gall Zeidler is performing both design and construction support services for the Riyadh Metro Project.  The project, begun in 2013, is planned for completion in 2018.

Oct 15, 2015
Link: http://tunnelingonline.com/riyadh-metro-line-2-east-tunnel-breakthrough/

  
Facilities
Related topics Related topics
Print version Print version
Send to friends Send to friends


CAPTCHA
::
View: 1313 Time(s)   |   Print: 615 Time(s)   |   Email: 0 Time(s)   |   0 Comment(s)
انجمن تونل ایران Iranian Tunneling Association
Persian site map - English site map - Created in 0.04 seconds with 41 queries by YEKTAWEB 4645