[Home ]   [ فارسی ]  
:: Home About Association News & Events Search Contact ::
Main Menu
Home::
About Us::
Tunnelling in Iran::
Working Groups::
News & Events::
Publications::
Library::
Useful Linkes::
Tunnel Database::
Photo Gallery::
Contact us::
Site Facilities::
webmail::
::
Receive site information
Enter your Email in the following box to receive the site news and information.
..
:: News ::
 | Post date: 2015/09/8 | 

Iran, Lorestan - ir/22
Hydropower
Pöyry has been awarded a EUR7 million engineering services contract by Sepasad Engineering Co. to undertake engineering services during the implementation of the 450 MW Rudbar-e-Lorestan hydropower project. Previously, Pöyry carried out technical studies for the project. The Rudbar-e-Lorestan dam and hydropower project will consist of a 180 m-high roller compacted concrete dam to create a reservoir with an estimated gross capacity of 228 million cubic metres. Water from the reservoir will be diverted through a 3 km-long headrace tunnel into the adjacent valley and hence in twin surface steel penstocks down to the surface power house on the bank of the Alkan river. The Rudbar-e-Lorestan hydro project is to be constructed in the upper reaches of the Dez catchment in the Zagros Mountains. Visit
www.poyry.com
26/07.
Link:
http://tunnelbuilder.com/Archive/Projects/Iran.aspx

  
Facilities
Related topics Related topics
Print version Print version
Send to friends Send to friends


CAPTCHA
::
View: 1295 Time(s)   |   Print: 614 Time(s)   |   Email: 0 Time(s)   |   0 Comment(s)
انجمن تونل ایران Iranian Tunneling Association
Persian site map - English site map - Created in 0.06 seconds with 41 queries by YEKTAWEB 4645