[Home ]   [ فارسی ]  
:: Home About Association News & Events Search Contact ::
Main Menu
Home::
About Us::
Tunnelling in Iran::
Working Groups::
News & Events::
Publications::
Library::
Useful Linkes::
Tunnel Database::
Photo Gallery::
Contact us::
Site Facilities::
webmail::
::
Receive site information
Enter your Email in the following box to receive the site news and information.
..
:: خبر ::
 | Post date: 2017/08/20 | 

End of the excavation of line 2 of Tabriz’s urban train
AWT IMAGE

After a year of continuous effort, Tabriz’s urban train line 2 came to the end and all TBM excavation equipment were taken out from its underground track successfully.
According to ISNA report, after the first station’s excavation finished last year, the excavation processes of line 2 intensified and got to the station number 2 by six hundreds of executive and engineering staff’s attempt at a depth of 40 meters underground during a year.
The diameter of this excavation is ten meters and two bilateral ways applied in parallel.
3.5 kilometers of underground track of line 2 have been excavated with all infrastructure principles considerations and due to the two successful station excavation performances, it is expected the executive operation and excavation of other stations get followed up more quickly by considering few distances between each other.
Tabriz’s subway line 2 is one of the longest subway tracks with the length of 22.4 kilometers. This line involves twenty stations which starts from Gharamalek lands (organic fertilizer factory), stretches through Vahdat street and Gharamalek square (first station) and after passing under the Akhuni street, Qods street, Amin three ways, Daneshsara square, enters to Abbasi street and continues to Shahid Fahmideh square and in the following to Valiasr three ways, Ostad Moein square, finally ends by reaching Basij square.

Date: 96/05/26
reference:
http://www.isna.ir/news/96052616468

  
Facilities
Related topics Related topics
Print version Print version
Send to friends Send to friends


CAPTCHA
::
Keywords: excavation | TBM | Tabriz subway | urban train |
View: 2644 Time(s)   |   Print: 763 Time(s)   |   Email: 0 Time(s)   |   0 Comment(s)
انجمن تونل ایران Iranian Tunneling Association
Persian site map - English site map - Created in 0.06 seconds with 42 queries by YEKTAWEB 4645